Post survey completion by Surveyor provide access for ROW (Right Of Way) for the piping
activity.Plan and supervise all activities for trenching by proper allocation of resources.Plan and
supervise all activities for stringing of pipes before welding starts.Supervise the welding activity
of pipes to ensure that work is completed on time with all quality and safety requirements met as
per procedure.Prepare the welding report and RFI (Request For Inspection) which needs to be sent to
QC before initiating inspection.Supervise the painting/ coating activity of the welded pipes to
prevent damage/ corrosion of the welded pipes.Conduct pre holiday tests on pipes before lowering the
pipes in the trench.Before lowering the pipe in trench supervise cleanliness of trench and ensure
inspection of sand pillow by QC.While lowering of pipes conduct holiday tests to check any damage to
the pipe.Conduct air pigging as a final cleaning exercise of the pipe.Prepare daily progress reports
for review by the Piping Superintendent.Prepare lowering report indicating specifications of the
pipe which needs to be submitted to the QC department.Carry out any other duties as and when
required by the supervisor.Manage and supervises the piping activities at the site on a day-to-day
basis and is responsible for the piping activity as per plan and layout. Establishes and maintains
timely completion of piping activities as per project schedule.10 - 30 yearsBasic - Bachelor of
Technology/Engineering
To apply for this job, contact us at:
Web site: http://www.petrofac.com

English
عربي
All Jobs
New job
Newsletters
About
Spread the word
RSS
Contact Us